Include a Progress Bar When Updating Navdata From the Navigraph Hub
Rationale
As a blind user of Navigraph Hub, I have no idea how far along my navdata updates are save for when the button changes from Updating to Remove . It would be helpful if there was a progress box under each button in the form of something like: %(fytes_transferred) of %(total_bytes), %(time_left) at %(transfer_speed)
Thoughts from other users and/or the developers of the Navigraph Hub?
Thanks!