Airport Update - LTFJ

Continuing the discussion from STAR missing for LTMJ airport:

The 06R runway and the consecutive taxiways are still being constructed. Most of the work is completed however it is not fully done yet. Attached is the satellite image taken on Oct 24th. The AIP has been released early (few months before) for ATCOs and aviation personnel to get used to the procedures and the airport extension before it is opened. The reason why I am writing is to let Navigraph and @AlvaroCampos know that existing on AIP =/= open and in use.

OP could download scenery from flightsim.to for updated layout (not fully updated)

Hi,
thanks for the info … the question was not, if a runway is still in used or still work in progress. The issue is that the runway idents are still changed to 06L/24R and 06R/24L and thats the reason for the missing STARs.

Every procedure is still changed from 06/24 to 06R/24L. These are hard facts and mapped with the AIP Turkey. When you check the notams, you will see this also very clear.

… as one example - you see 24L:

A7728/23 NOTAMR A6800/23
Q) LTBB/QPIAU/I /NBO/A /000/999/4054N02919E005
A) LTFJ B) 2310160637 C) 2311160900 EST
E) FOLLOWING PROCEDURES FOR RWY 24L SUSPENDED.
- ILS Z CAT I RWY 24L (IAC-25),
- ILS Y CAT I RWY 24L (IAC-26),
- ILS X CAT I RWY 24L (IAC-27),

REF AIP AD2 LTFJ IAC25-IAC27

The same for the runway 06R/24L which seems to be still in progress till mid of November:

A7482/23 NOTAMR A7106/23
Q) LTBB/QMRLC/IV/NBO/A /000/999/4054N02919E005
A) LTFJ B) 2310060943 C) 2311131400
E) RWY 06R/24L CLSD TO TFC EXC FLTCK AIRCRAFT OF GENERAL DIRECTORATE 
OF STATE AIRPORT AUTHORITY DUE TO WIP.

Cheers
Richard